K
Command Center

The loop is closing 27× faster

One number matters: time to close the loop, from a defect in a customer's kitchen to a fix at the production line, supplier, or design. Legacy: 12–18 months. Target: 2 weeks.

Loop Closure Time · Rolling 30 days

Field signal → root cause → fix, average across active programs

96% vs legacy
Legacy baseline
428days
≈ 14 months
Loopback today
16days
Feb '26 average
Target
14days
≈ 2 weeks
Warranty Exposure
Legacy accumulation vs Loopback avoidance (modeled, €M)
Cumulative avoided€142.0M
Modeled against automotive field-quality benchmarks.
Active Defect Signals
+4.2%
1,940
last 24h
Open Investigations
+8
63
7d
Hypotheses Awaiting
12 high-conf
21
review queue
Lots Under Containment
3 new
14
active
Units-at-Risk Prevented
+142k
1,920,000
cumulative
Warranty Avoided
modeled
€142.0M
cumulative

The Loop

Continuous four-stage flow vs the legacy serial handoff chain. The contrast is the whole pitch.

Agentic reasoning inline
L
Loopback — continuous, parallel
Stage 1
Field Signal
4havg latency
1240/day throughput
Stage 2
Root Cause
38havg latency
38/day throughput
Stage 3
Production Response
62havg latency
22/day throughput
Stage 4
Design Feedback
96havg latency
9/day throughput
×
Legacy handoff chain — serial, lossy, ~14 months end-to-end
Technician logs defect
+0d
Warranty analytics (quarterly)
+62d
Quality writes CAPA
+118d
Plant engineering reads CAPA
+176d
Design engineering pattern review
+312d
Design change in next-gen
+428d

Priority Investigations

Top active investigations, ranked by exposure. Continuum handoffs flagged.

Recent Activity

Signals, patterns, hypotheses, containment, ECRs.

  • loop-closed
    INV-2052 closed — loop time 13 days (firmware fix v4.2.3)
    3m ago
  • hypothesis
    INV-2049 top hypothesis validated by P. Iyer
    22m ago
  • containment
    CA-4021 launched: tighten inspection AxleWorks lots W32–W38
    48m ago
  • pattern
    PAT-2053 crossed threshold — WM14N270EU drum bearing (Hamburg)
    1h ago
  • triangulated
    PAT-2049 triangulation ↑ to 0.94 (added Sprinklr source)
    2h ago
  • ecr
    ECR-2026-0091 raised: bearing housing redesign to PLM
    3h ago

Field → Factory Map

Where defects surface (field signal geography), where they were built (plants), who supplied the implicated components.

MunichBerlinChennai
Field signal
Plant
Supplier
Field → factory flow
15 regions · 4 plants · 5 suppliers implicated